About this project

Oxford County has awarded a contract to replace two culverts on Oxford Road 59, between municipal No. 385201 and municipal No. 385229, to GIP Paving Inc. of Petersburg, Ontario. The work includes culvert replacements and restoration works as required.

Culvert replacements are tentatively scheduled to begin in September 2023 and be completed by October 2023. Construction schedules are weather dependent and subject to change based on contractor availability and other operational demands. The approximate construction limits are shown (highlighted orange) on the back of this construction notice.

What you need to know

Oxford Road 59 between Oxford Road 13 and Middletown Line will be closed to through traffic during culvert replacements and traffic will be limited to local residents, businesses and emergency services. The contractor will be required to maintain access as best as possible to all properties. Some short-term interruptions and delays can be expected during this work. There will be a planned detour route in place for the road closure section including applicable detour signage.

Please continue to have your regular household waste and recyclables to the roadside by 7:00 a.m. on your regular pick up day. If access for waste collection is interrupted by construction, the contractor will collect your bins and containers and take them to a central location for collection. Property owners are asked to mark garbage and recycling containers with their house number so they can be returned to the correct properties.

Please reduce speed and obey construction warning signage within the work zone. Maintain a safe distance from construction equipment and workers while entering and leaving the construction limits.

Questions

Alex Brown, C.Tech.
Senior Coordinator, Construction
Oxford County Public Works
21 Reeve Street, P.O Box 1614
Woodstock, ON N4S 7Y3
519-539-9800, ext. 3138
abrown@oxfordcounty.ca

This notice issued May 3, 2023